July 10, 2026

Centurion Canada Completes Wastewater System Refresh at Remote Alberta Camp

Share

Centurion’s Canada region recently completed a wastewater system refresh at a remote accommodation facility for a long-standing camp provider customer in Canada.


Spring conditions in the remote location in Northern Alberta created a tight window for the work, with the risk of road bans if the project was delayed. To maintain uninterrupted service, Centurion’s Water & Wastewater Solutions and Cranes & Lifting business lines carefully coordinated the removal of the existing system and installation of the replacement.


The team replaced two extended aeration wastewater treatment plants with one refurbished membrane bioreactor (MBR) wastewater treatment plant, complete with remote telemetry, and a 400-barrel tank.


By combining expertise from Water & Wastewater Solutions and Cranes & Lifting business lines, Centurion Canada delivered an integrated solution that included wastewater treatment, a 160-tonne crane, trucking and logistics for two loads in and out, vacuum truck, equipment, crew support, and commissioning services to ensure a seamless system installation.


Learn more.

news

Latest News

Stay informed about our latest solutions, innovations, and success stories that empower our customers to thrive in critical sectors worldwide.


Portrait of Adrian Hart beside text “Meet the President,” on a blue background
July 3, 2026
Adrian Hart discusses his career journey through equipment rental and infrastructure, his approach to integrating businesses, and his vision for continued growth.
Two people reviewing plans on a workbench in a workshop, one pointing at a blueprint.
June 29, 2026
Centurion renews its ISO recertification following a 30-day audit. The certification covers ISO 9001, ISO 14001, ISO 45001, & UK SSIP SafeContractor accreditation.
Yellow excavator at an outdoor event beside white tents and green machinery displays
June 24, 2026
Centurion recently attended two key industry events in Canada, strengthening our presence across the mining and energy sectors while showcasing our equipment.
June 22, 2026
Strategic momentum drives strong FY’25 results and future growth
Portrait of Chris Gindl beside “Meet the President” text on a blue background, Canada Region
June 19, 2026
Chris Gindl, President of Centurion’s Canada region, delves into his career journey, how he structures his day-to-day, and the service excellence of our Canada team.
Two yellow cargo containers on flatbed trucks parked on a dirt road at sunset
June 10, 2026
Rapid Camps, part of Centurion’s Asia Pacific region, has secured a contract with Yindjibarndi Energy Corporation (YEC) to deliver a 204-person workforce camp.

Contact Us

Ready to get to work?

Let's Talk.