September 30, 2014

24 Module Multi-Purpose TLQ Complex for Gulf Drilling International

Share

Scope of Work

Gulf Drilling International required a DNV-certified, A60-rated Temporary Living Quarters (TLQ) complex to accommodate 46 personnel onboard the GDI Dixie Patriot lift-boat, supporting operations for Dolphin Energy in Qatar. The modular solution had to be delivered within a tight two-month timeline and tailored to meet additional H₂S safety requirements due to elevated gas concentrations at the operation site. 

Execution

Specialist Services, part of Centurion’s Middle East & North Africa region, designed and delivered a 24-module, multi-purpose TLQ complex on a rental basis. The complex included accommodation, gymnasium, recreation, conference and locker rooms, offices and medic facilities with a complete bolted walkway system, all designed around a fully modular installation. Several units were converted into double-wide configurations—combining two 20' modules—to support larger internal spaces such as the recreation room and conference area, while retaining full DNV, A60, and CSC certifications. 



The walkways for the TLQ complex were designed and constructed using a fully weld free bolting design for the first time and were fabricated and installed on site within a 3-week project lead time. The team also installed a dedicated gas detection system with dampers linked to a gas monitoring panel on the vessel bridge, meeting the client's stringent H₂S safety standards. The entire project was completed at Damen Shipyards in Hamriyah Port, Ajman, in alignment with the vessel’s scheduled sailing. 


Outcome & Value Delivered

The TLQ complex was delivered on time and in full compliance with client and regulatory requirements, enabling the GDI Dixie Patriot to support upgrade operations for Dolphin Energy’s platforms in Qatar.


The project marked Specialist Services’ largest TLQ rental delivery at the time and opened new opportunities in the market for turnkey modular accommodation on long- and short-term rental contracts. 

Case studies

Proven Track Record

Centurion’s expertise is proven in the field. Browse our case studies that demonstrate how we deliver smart, reliable equipment and service solutions in complex environments around the globe. 

Industrial site with tanks, pipes, and machinery. Workers in high-vis vests and a digger in the background. Overcast sky.
November 28, 2025
Centurion has completed a purpose-built truck washdown wastewater treatment plant for a major gold mining operator in Boddington, Western Australia.
Trido engineers reviewing solar technology equipment
November 10, 2025
Centurion is enabling sustainable oil & gas operations across the US through the deployment of solar-powered air compression and chemical injection technologies
ChloriDOS iOX chlorine dioxide system on a wall; it has a digital display and clear cylinder.
September 8, 2025
WestWater (a Centurion company) replaced sodium hypochlorite with a ChloriDOS iOX Chlorine Dioxide system to tackle THM compliance risks.
Two white water treatment machines in a room, with hazardous area floor mat.
September 8, 2025
WestWater (a Centurion company) replaced chlorine gas systems for a client in the Northern Territory, Australia, with Hyprolyser® Electrochlorination technology.
Water filtration system in a clean, bright room. Cylindrical white filters on metal framework.
September 8, 2025
WestWater (a Centurion company) delivers full replacement reverse osmosis and filtration system to overcome ageing infrastructure at Denham water treatment plant.
A water treatment system with green pumps, pipes, and control panels inside an open metal enclosure.
September 8, 2025
Westwater (a Centurion company) upgraded the sodium hypochlorite dosing and storage system at Coombabah, the Gold Coast’s largest sewage treatment plant.