August 4, 2021

70-Man LQ Complex for Sapura Energy

Share

Scope of Work

Sapura Energy required a turnkey 70-man Living Quarters (LQ) complex for installation on the Integrated Central Processing Platform (ICPP) at the Pegaga Gas Field in Block SK320, offshore Sarawak, Malaysia. The project involved design, engineering, procurement, construction, outfitting, installation of equipment, third party approvals, testing, and pre-commissioning under stringent offshore safety and regulatory standards, with complex stakeholder coordination and execution during the global pandemic. 

Execution

Specialist Services, part of Centurion’s Middle East & North Africa region, delivered the LQ complex using modular construction to maximize offsite fabrication efficiencies and reduce site installation timelines and costs. The four-level structure—with total dimensions of 39.16m x 11.8m x 19m and a helideck on top—was designed for permanent offshore use. 


The project required seamless coordination between Sapura Energy and Mubadala Petroleum in Malaysia, and Specialist Services teams across Dubai, India, and Singapore. These teams jointly managed engineering, project management, techno-commercial, transportation, installation, and delivery support. Despite COVID-19 restrictions, the modules were completed and shipped in Q2 2020, with installation and final commissioning supported on-site in Malaysia during challenging conditions. 


Outcome & Value Delivered

The 70-man LQ complex was successfully delivered and integrated into the Pegaga platform, meeting all technical, safety, and operational requirements.


This complex, multinational project demonstrated Specialist Services’ ability to execute large-scale EPC contracts with agility, even under pandemic-related constraints. The project reinforced Specialist Services’ reputation as a trusted partner for permanent offshore accommodation solutions in the Asia-Pacific region. 

Case studies

Proven Track Record

Centurion’s expertise is proven in the field. Browse our case studies that demonstrate how we deliver smart, reliable equipment and service solutions in complex environments around the globe. 

Industrial site with tanks, pipes, and machinery. Workers in high-vis vests and a digger in the background. Overcast sky.
November 28, 2025
Centurion has completed a purpose-built truck washdown wastewater treatment plant for a major gold mining operator in Boddington, Western Australia.
Trido engineers reviewing solar technology equipment
November 10, 2025
Centurion is enabling sustainable oil & gas operations across the US through the deployment of solar-powered air compression and chemical injection technologies
ChloriDOS iOX chlorine dioxide system on a wall; it has a digital display and clear cylinder.
September 8, 2025
WestWater (a Centurion company) replaced sodium hypochlorite with a ChloriDOS iOX Chlorine Dioxide system to tackle THM compliance risks.
Two white water treatment machines in a room, with hazardous area floor mat.
September 8, 2025
WestWater (a Centurion company) replaced chlorine gas systems for a client in the Northern Territory, Australia, with Hyprolyser® Electrochlorination technology.
Water filtration system in a clean, bright room. Cylindrical white filters on metal framework.
September 8, 2025
WestWater (a Centurion company) delivers full replacement reverse osmosis and filtration system to overcome ageing infrastructure at Denham water treatment plant.
A water treatment system with green pumps, pipes, and control panels inside an open metal enclosure.
September 8, 2025
Westwater (a Centurion company) upgraded the sodium hypochlorite dosing and storage system at Coombabah, the Gold Coast’s largest sewage treatment plant.

Contact Us

Ready to get to work?

Let's Talk.