Scope of Work

Zakher Marine International required a large-scale Temporary Living Quarters (TLQ) complex to accommodate 150 personnel on board the QMS Pearl jack up barge offshore Abu Dhabi for Zakum Development Company (ZADCO). The solution needed to be ABS certified, A60 fire rated, installed on a limited laydown area, and delivered within a short lead time for a minimum contract duration of 615 days. 

Execution

Specialist Services, part of Centurion's Middle East & North Africa region, supplied and installed a 77-module TLQ complex, including 75 ABS certified Accommodation Modules and two combined modules to serve as a larger recreation room. To meet the tight delivery schedule, 10 modules were newly manufactured, while another 10 were transferred from Specialist Services’ Singapore facility. 


Delivery of all modules and associated stairway and walkway systems to the site required coordinated multi-trailer logistics from the Jebel Ali yard to offshore Abu Dhabi. Onsite installation was completed within four weeks, thanks to the exceptional coordination between Specialist Services’ teams in the yard and on site, and in close collaboration with the client and other contractors. 


Outcome & Value Delivered

The TLQ complex was successfully installed and operational by 1st September 2016, marking one of the largest TLQ rental contracts globally at the time - demonstrating Specialist Services’ ability to execute high-volume, high-specification modular accommodation projects with precision and speed. 


The client issued an official letter of appreciation recognizing the dedication, professionalism, and technical excellence of the Specialist Services team. The TLQ complex continues to support offshore accommodation needs on board the QMS Pearl jack up barge, reinforcing Specialist Services’ leadership in turnkey modular solutions for offshore living in remote and challenging environments. 


Case studies

Proven Track Record

Centurion’s expertise is proven in the field. Browse our case studies that demonstrate how we deliver smart, reliable equipment and service solutions in complex environments around the globe. 

Industrial site with tanks, pipes, and machinery. Workers in high-vis vests and a digger in the background. Overcast sky.
November 28, 2025
Centurion has completed a purpose-built truck washdown wastewater treatment plant for a major gold mining operator in Boddington, Western Australia.
Trido engineers reviewing solar technology equipment
November 10, 2025
Centurion is enabling sustainable oil & gas operations across the US through the deployment of solar-powered air compression and chemical injection technologies
ChloriDOS iOX chlorine dioxide system on a wall; it has a digital display and clear cylinder.
September 8, 2025
WestWater (a Centurion company) replaced sodium hypochlorite with a ChloriDOS iOX Chlorine Dioxide system to tackle THM compliance risks.
Two white water treatment machines in a room, with hazardous area floor mat.
September 8, 2025
WestWater (a Centurion company) replaced chlorine gas systems for a client in the Northern Territory, Australia, with Hyprolyser® Electrochlorination technology.
Water filtration system in a clean, bright room. Cylindrical white filters on metal framework.
September 8, 2025
WestWater (a Centurion company) delivers full replacement reverse osmosis and filtration system to overcome ageing infrastructure at Denham water treatment plant.
A water treatment system with green pumps, pipes, and control panels inside an open metal enclosure.
September 8, 2025
Westwater (a Centurion company) upgraded the sodium hypochlorite dosing and storage system at Coombabah, the Gold Coast’s largest sewage treatment plant.