April 11, 2025

Expansion of Water & Wastewater Treatment Infrastructure for Atlas Iron

Share

To support Atlas Iron’s expansion at Sanjiv Ridge, Centurion delivered a compact, containerised water and wastewater treatment solution that increased capacity, met Class C discharge standards, and integrated with the site’s SCADA network. Fully automated and scalable, the system improved performance and efficiency while using existing infrastructure to keep costs down, positioning Centurion as a trusted partner in the mine’s growth. 


Scope of Work


As part of its accommodation expansion from 180 to 250 personnel, Atlas Iron required a significant upgrade to its Reverse Osmosis (RO) water treatment plant and wastewater treatment plant at Sanjiv Ridge. The solution needed to be robust, efficient, and fully compatible with the site’s remote monitoring and control systems. 

Client Challenges: 


  • Increased capacity to process 65m³/day 
  • Compact 40ft containerised design to suit site constraints 
  • Compliance with Class C effluent discharge standards 
  • Full automation and SCADA compatible PLC systems integrated into the existing remote monitoring network 
  • Enhanced flow and pressure control for improved operational control 


Execution


Centurion developed a customized water and wastewater treatment solution tailored to Atlas Iron’s specific needs: 


Reverse Osmosis (RO) Plant 


  • 40ft containerized system with a capacity of 75m³/day. 
  • Fully integrated SCADA-compatible PLC for seamless remote monitoring. 
  • Motorized flow control valves and digital pressure sensors enabling real-time automation and control. 
  • System designed to adapt to feed water characteristics having received the client’s water analysis. 


Wastewater Treatment Plant (WWTP) 


  • Designed to meet Class C discharge compliance. 
  • Scalable 40ft containerized unit with a processing capacity of 65m³/day. 
  • External anoxic tanks or dual-unit configuration to enhance biological treatment performance. 
  • SCADA-integrated PLC, motorized flow valves and digital pressure sensors for an efficient, remote-managed operation. 


Outcome & Value Delivered 


  • Scalable and Future-Ready Infrastructure – Designed to support immediate expansion while allowing for long-term growth. 
  • Integrated Remote Monitoring & Automation – Seamlessly connected to the client’s existing SCADA system for real-time oversight and control. 
  • Enhanced Treatment Performance – Delivered reliable compliance with WWTP licence requirements while maximizing operational efficiency. 
  • Cost-Efficient Design – Leveraged existing raw and treated water tanks to minimize capital investment. 


By delivering a modular, fully automated, high-capacity water treatment solution tailored to Atlas Iron’s operational needs, Centurion established itself as a trusted partner in the mine’s expansion. 


Case studies

Proven Track Record

Centurion’s expertise is proven in the field. Browse our case studies that demonstrate how we deliver smart, reliable equipment and service solutions in complex environments around the globe. 

Industrial site with tanks, pipes, and machinery. Workers in high-vis vests and a digger in the background. Overcast sky.
November 28, 2025
Centurion has completed a purpose-built truck washdown wastewater treatment plant for a major gold mining operator in Boddington, Western Australia.
Trido engineers reviewing solar technology equipment
November 10, 2025
Centurion is enabling sustainable oil & gas operations across the US through the deployment of solar-powered air compression and chemical injection technologies
ChloriDOS iOX chlorine dioxide system on a wall; it has a digital display and clear cylinder.
September 8, 2025
WestWater (a Centurion company) replaced sodium hypochlorite with a ChloriDOS iOX Chlorine Dioxide system to tackle THM compliance risks.
Two white water treatment machines in a room, with hazardous area floor mat.
September 8, 2025
WestWater (a Centurion company) replaced chlorine gas systems for a client in the Northern Territory, Australia, with Hyprolyser® Electrochlorination technology.
Water filtration system in a clean, bright room. Cylindrical white filters on metal framework.
September 8, 2025
WestWater (a Centurion company) delivers full replacement reverse osmosis and filtration system to overcome ageing infrastructure at Denham water treatment plant.
A water treatment system with green pumps, pipes, and control panels inside an open metal enclosure.
September 8, 2025
Westwater (a Centurion company) upgraded the sodium hypochlorite dosing and storage system at Coombabah, the Gold Coast’s largest sewage treatment plant.

Contact Us

Ready to get to work?

Let's Talk.