Record-Breaking Fracturing Support Delivered with Hydralok™ Technology and Accommodation Solutions
Scope of Work
Centurion was commissioned to support a long-term production program involving over 100 wells in a geologically challenging basin within the Mountain West region. The customer required a high-performance, scalable solution to manage pressure control, reduce equipment changeout, and improve logistics efficiency.
Execution
Centurion deployed its patented Hydralok™ valve technology across 106 wells to support high-pressure, multi-stage fracturing operations. Each well utilized 10 Hydralok™ valves, with stacks rigged down and efficiently redeployed to subsequent wells – significantly reducing downtime and simplifying site logistics.
In addition to pressure control, Centurion supplied modular accommodation units and fluid management services, providing a fully integrated support package from multiple business lines. Operations were delivered safely and efficiently over a 32-month period.
Outcome & Value Delivered
Deployment of Hydralok™ valves support continuous high-pressure operations across a large-scale Mountain West drilling program.
A total of 1,060 Hydralok™ valves were deployed, achieving a 99.9% success rate, with the campaign setting a customer performance record. By combining advanced technology, logistical efficiency, and multi-service delivery, Centurion helped optimize completions performance while supporting continuous operations in a complex and remote environment.












